Toughenable Enamelled Glass
0,00 €Technical Information
Processing Possibilities | Comments | |
Safety | Toughened | Convection tempering furnace is highly recommended. The enamelled side must be facing upwards. |
Laminated | Laminating via PVB, or EVA films | |
Cutting | Rectangular or circular | Easily cuttable before tempering. |
Shaping and edge finishing | Edge grinding | Edge grinding should be prosseced before tempering. – enamelled side always facing downwards. |
Drilling | Edge grinding should be prosseced before tempering. – enamelled side always facing downwards. | |
Notches | Always before tempering. | |
Special treatments | Sand-blasting | Sand-blasting could be done on both sides before or after tempering. |
Acid-frosting | Acid etching is available on both sides before or after tempering. (both soft etching & deep etching) | |
Printing | Any printing is applicable. | |
Bending | Enamelled side always facing away from the mold. |
Toughenable Enamelled Glass
0,00 €Technical Information
Processing Possibilities | Comments | |
Safety | Toughened | Convection tempering furnace is highly recommended. The enamelled side must be facing upwards. |
Laminated | Laminating via PVB, or EVA films | |
Cutting | Rectangular or circular | Easily cuttable before tempering. |
Shaping and edge finishing | Edge grinding | Edge grinding should be prosseced before tempering. – enamelled side always facing downwards. |
Drilling | Edge grinding should be prosseced before tempering. – enamelled side always facing downwards. | |
Notches | Always before tempering. | |
Special treatments | Sand-blasting | Sand-blasting could be done on both sides before or after tempering. |
Acid-frosting | Acid etching is available on both sides before or after tempering. (both soft etching & deep etching) | |
Printing | Any printing is applicable. | |
Bending | Enamelled side always facing away from the mold. |
Toughenable Enamelled Glass
0,00 €Technical Information
Processing Possibilities | Comments | |
Safety | Toughened | Convection tempering furnace is highly recommended. The enamelled side must be facing upwards. |
Laminated | Laminating via PVB, or EVA films | |
Cutting | Rectangular or circular | Easily cuttable before tempering. |
Shaping and edge finishing | Edge grinding | Edge grinding should be prosseced before tempering. – enamelled side always facing downwards. |
Drilling | Edge grinding should be prosseced before tempering. – enamelled side always facing downwards. | |
Notches | Always before tempering. | |
Special treatments | Sand-blasting | Sand-blasting could be done on both sides before or after tempering. |
Acid-frosting | Acid etching is available on both sides before or after tempering. (both soft etching & deep etching) | |
Printing | Any printing is applicable. | |
Bending | Enamelled side always facing away from the mold. |
Toughened Glass
0,00 €PVB Interayer UV Transmittance percentage table
%UV Transmittance | Laminate Specifications |
%18 | 0.38 mm |
%4.5 | 0.76 mm |
%1.25 | 1.14 mm |
%1 | 1.52 mm |
Proved UV raydiance is 380 nm |
Toughened Glass
0,00 €PVB Interayer UV Transmittance percentage table
%UV Transmittance | Laminate Specifications |
%18 | 0.38 mm |
%4.5 | 0.76 mm |
%1.25 | 1.14 mm |
%1 | 1.52 mm |
Proved UV raydiance is 380 nm |
Toughened Glass
0,00 €PVB Interayer UV Transmittance percentage table
%UV Transmittance | Laminate Specifications |
%18 | 0.38 mm |
%4.5 | 0.76 mm |
%1.25 | 1.14 mm |
%1 | 1.52 mm |
Proved UV raydiance is 380 nm |
Unitised Facades Glass Facade
0,00 €Unitised panels typically include a structural framing system, sheathing, weatherproofing, insulation and exterior wall cladding. Today, most construction projects are subject to intense time pressure.
Unitised Facades Glass Facade
0,00 €Unitised panels typically include a structural framing system, sheathing, weatherproofing, insulation and exterior wall cladding. Today, most construction projects are subject to intense time pressure.
Unitised Facades Glass Facade
0,00 €Unitised panels typically include a structural framing system, sheathing, weatherproofing, insulation and exterior wall cladding. Today, most construction projects are subject to intense time pressure.